Skip to content

Water Bath Temperature Monitoring Log template

A log in the Facilities and Environment procedure (PR15), mapped to ISO 15189:2022 clauses 6.3, 6.4. Fill it in daily. Used by the quality-management team.

LogISO 15189 · 6.3, 6.4Daily
Preview of the Water Bath Temperature Monitoring Log as printed by LabToolkit Pro
Calculated automaticallyRed = outside limits
Your LaboratoryWater Bath Temperature Monitoring Log | YL-QM-LOG-15-F01f v1.0

Record: Water Bath Temperature Monitoring Log — October 2026

Calibration Correction Factor (CF): ______ Apply CF as per Equipment Calibration Procedure PR16
DayAM Reading
°C
AM CF AppliedAM Corrected
°C
PM Reading
°C
PM CF AppliedPM Corrected
°C
Action Taken (if out of range)Equipment Status (OK / OOR / OOS)AM InitialsPM InitialsChecked byDate CheckedNotes
145.200.1444.4044.400.0845.30None requiredOKTMTMR. Naidoo2026-10-01Within limits
245.20-0.0444.5045.70-0.1045.30None requiredOKRNRNS. Dlamini2026-10-02
345.500.0145.8044.900.0545.40None requiredOKSDSDA. Mensah2026-10-03
447.500.0347.5047.500.0647.50Investigated and repeated: within limitsOORAMAML. Banda2026-10-04Within limits
5450.0444.3044.40-0.0245.70None requiredOKLBLBK. Otieno2026-10-05
645.300.0845.6045.500.0845.50None requiredOKKOKOT. Moyo2026-10-06
745.60-0.1044.50450.1145None requiredOKTMTMR. Naidoo2026-10-07Within limits
844.90-0.0244.5045.300.1244.50None requiredOKRNRNS. Dlamini2026-10-08

Sign-off

RoleNameSignatureDate
Completed by
Reviewed by

Shaded cells are calculated automatically. Values in red are outside their limits. † marks a corrected value (see Corrections).

Controlled document. Printed copies are uncontrolled unless stamped.Page 1
A4 landscape · first page · showing 8 of 8 rowsExactly as LabToolkit Pro prints it — with your logo and colours

What it records

  • Day
  • AM Reading
  • AM CF Applied
  • AM Corrected
  • PM Reading
  • PM CF Applied
  • PM Corrected
  • Action Taken (if out of range)
  • Equipment Status (OK / OOR / OOS)
  • AM Initials
  • PM Initials
  • Checked by
  • Date Checked
  • Notes

Instructions on the form

  • Calibration Correction Factor (CF): ______ Apply CF as per Equipment Calibration Procedure PR16

Sign-off

  • Completed by
  • Reviewed by

Related templates

Clause references are to ISO 15189:2022; check them against your licensed copy of the standard.