Skip to content

Equipment Maintenance & Occurrence Log template

A log in the Equipment and Calibration procedure (PR16), mapped to ISO 15189:2022 clause 6.4. Fill it in monthly. Used by the laboratory team.

LogISO 15189 · 6.4Monthly
Preview of the Equipment Maintenance & Occurrence Log as printed by LabToolkit Pro
Calculated automaticallyRed = outside limits
Your LaboratoryEquipment Maintenance & Occurrence Log | YL-LAB-LOG-16-F04 v1.0

Record: Equipment Maintenance & Occurrence Log — October 2026

Equipment IDEQ-012
Record all preventive maintenance, corrective maintenance, incidents, and equipment occurrences. For equipment failures, open a Nonconformity on PR07-F01.
Entry No.DateEquipment NameEquipment ID / SNType of Activity (PM / CM / Occurrence / Calibration)Description of Activity / FaultAction Taken / Parts ReplacedPerformed by (Name / Company)NC No. (if opened)Functionality Check (Pass / Fail)IQC / EQA Verified? (Y/N)Authorised byDate Completed
REF-26-0012026-10-01S. DlaminiEQ-012Preventive MaintenanceMonthly QC reviewNone requiredS. DlaminiNC-26-001PassYR. Naidoo2026-10-01
REF-26-0022026-10-08A. MensahEQ-013Preventive MaintenanceEquipment maintenanceNone requiredA. MensahNC-26-002PassYS. Dlamini2026-10-08
REF-26-0032026-10-15L. BandaEQ-014Preventive MaintenanceDocument reviewNone requiredL. BandaNC-26-003PassYA. Mensah2026-10-15
REF-26-0042026-10-22K. OtienoEQ-015Preventive MaintenanceCompetency assessmentInvestigated and repeated: within limitsK. OtienoNC-26-004FailNL. Banda2026-10-22
REF-26-0052026-10-29T. MoyoEQ-016Preventive MaintenanceMonthly QC reviewNone requiredT. MoyoNC-26-005PassYK. Otieno2026-10-29
REF-26-0062026-11-05R. NaidooEQ-017Preventive MaintenanceEquipment maintenanceNone requiredR. NaidooNC-26-006PassYT. Moyo2026-11-05
REF-26-0072026-11-12S. DlaminiEQ-018Preventive MaintenanceDocument reviewNone requiredS. DlaminiNC-26-007PassYR. Naidoo2026-11-12
REF-26-0082026-11-19A. MensahEQ-019Preventive MaintenanceCompetency assessmentNone requiredA. MensahNC-26-008PassYS. Dlamini2026-11-19

Sign-off

RoleNameSignatureDate
Completed by
Reviewed by

Shaded cells are calculated automatically. Values in red are outside their limits. † marks a corrected value (see Corrections).

Controlled document. Printed copies are uncontrolled unless stamped.Page 1
A4 landscape · first page · showing 8 of 8 rowsExactly as LabToolkit Pro prints it — with your logo and colours

What it records

  • Entry No.
  • Date
  • Equipment Name
  • Equipment ID / SN
  • Type of Activity (PM / CM / Occurrence / Calibration)
  • Description of Activity / Fault
  • Action Taken / Parts Replaced
  • Performed by (Name / Company)
  • NC No. (if opened)
  • Functionality Check (Pass / Fail)
  • IQC / EQA Verified? (Y/N)
  • Authorised by
  • Date Completed

Instructions on the form

  • Record all preventive maintenance, corrective maintenance, incidents, and equipment occurrences. For equipment failures, open a Nonconformity on PR07-F01.

Sign-off

  • Completed by
  • Reviewed by

Related templates

Clause references are to ISO 15189:2022; check them against your licensed copy of the standard.